Buyer's Guide

Which pipe type is best for our building? A practical buyer's guide

A step-by-step guide to choosing water pipes for a house, apartment or villa: hot and cold lines, PN class, markings to check, fittings and pressure testing.

5 min readUpdated
ForHomeownersContractorsPlumbers

Pipes are hidden inside walls and floors for decades, and replacing them later means breaking tiles. That makes the pipe choice one of the most important decisions when you build or renovate, even though it is a small part of the total cost. This guide gives you a simple way to decide, and a checklist to use at the shop and on site.

Step 1: Understand your building

Start with a few questions:

  • What type of building? A single house, an apartment block or a large villa.
  • Where does the water come from? A roof tank by gravity, a booster pump, or both. See Water distribution systems in buildings.
  • How is hot water made? Electric heater, boiler, solar heater or a central system.
  • Is there underfloor heating or radiators?

The answers point you to the right material and pressure class.

Step 2: Choose the material

For most homes in Iraq and the Kurdistan Region, the practical choice for hot and cold water is between PPR and PEX-type pipes. See PPR vs PEX for the details.

Building or useCommon sensible choiceNotes
House or apartment, hot and cold waterPPRWidely available, low-cost fittings, strong fusion joints
Long or exposed hot water lines, risersFiber composite PPRLess thermal expansion
Underfloor heatingPEX, PE-RT or multilayerFlexible coils with no joints under the floor
Manifold layout in a villaPEX, multilayer or PPRChoose by installer experience
Underground supply from the streetPE / HDPEMade for burial; cold water only
DrainageuPVC or PP drainage pipeNever use supply pipe for drainage

There is no single "best" pipe. The best system is a good-quality product, suited to the job, installed by someone experienced with it.

Step 3: Choose the pressure class

For PPR, the PN number tells you the pressure the pipe can carry at 20 °C, and the real limit falls as water gets hotter. A simple rule:

  • Hot water lines: PN20, PN25 or fiber composite pipe rated for hot water.
  • Cold water lines: PN16 or PN20, especially after pumps.
  • Simplest option: use PN20 throughout, so hot and cold pipes can never be mixed up on site.

Read PN10, PN16, PN20 and PN25 explained for the reasons.

Step 4: Check the markings on the pipe

A good pipe carries clear printing along its length. Look for:

  1. Manufacturer name or brand.
  2. Material, for example PP-R or PP-RCT.
  3. Size: outer diameter × wall thickness, for example 25 × 4.2.
  4. SDR or S series and PN class.
  5. Standard, for example DIN 8077/8078 or ISO 15874 (EN ISO 15874).
  6. Production date or batch number, which allows traceability.

If the printing is missing, smudged or does not match (for example a PN20 label on a pipe with a thin wall), choose another product. Uniform colour, a smooth inside surface and round, even walls are also good signs. For a general view of markings and certificates, see Standards and certifications.

Step 5: Fittings, valves and transitions

  • Use fittings from the same system as the pipe, including elbows, tees and reducers.
  • Where pipe meets a tap, mixer or valve, use proper threaded transition fittings with metal inserts.
  • Choose good brass valves and plan isolation by floor, by apartment and by room. See Valve types.
  • Insulate hot water pipes and protect any pipe exposed to sunlight.
  • Allow for thermal expansion on long hot runs with loops, offsets or fiber pipe.

Step 6: Pressure test before tiling

This is the step that saves the most money. Before plastering, tiling or pouring screed:

  1. Close all outlets with test plugs and fill the system slowly, venting the air.
  2. Wait for fusion joints to cool fully, as the manufacturer instructs.
  3. Raise the pressure to the test value given by the pipe manufacturer or the engineer. It is often around one and a half times the working pressure.
  4. Hold it for the specified time and watch the gauge and every joint.
  5. Record the result, with date and pressure, and keep photos of the pipe routes.

Quick checklist

  • Right material for each part of the building.
  • PN20 or better for hot water; consider PN20 throughout.
  • Clear markings: brand, material, size, SDR, PN, standard, batch.
  • One system and one manufacturer for pipes and fittings.
  • Experienced installer with the correct tools.
  • Valves at every level of isolation.
  • Pressure test passed and recorded before tiling.

For sizes, see Pipe types and sizes.

You are welcome to visit the VAMO showrooms in Ranya and Erbil to see pipes, fittings and valves in person and ask any questions.

Have a question about your project?

Call us or visit one of our showrooms. Our team will explain the options in plain words.